The Weaverland Valley Authority (“WVA”) was formed in March 2016 by East Earl Township (“Township”) and Terre Hill Borough (“Borough”) to provide all water and sewer services for the Township and the Borough. This joint authority was formed in response to the Consent Order and Agreement with DEP and the 2015 Joint Act 537 Plan. The Joint Act 537 Plan can be found on this website as well as on the Township and Borough websites. The WVA is responsible for implementing the Act 537 Plan which includes building a new sewage collection system and wastewater treatment plant. The WVA will also assume all water and sewer responsibilities for the Blue Ball Water Authority, East Earl Sewer Authority and Terre Hill Borough Authority.
The WVA meets at 6:30 p.m. the Second Monday of the month with the occasional exceptions shown in the meeting schedule below.
The June 4th and 7th, 2022 Public Meeting provided the following information, now available as download.
REGIONAL WWTF AND COLLECTION / CONVEYANCE SYSTEM PROJECT PUBLIC MEETING INFORMATION
A new ‘drive-up’ drop box is available for residents as a convenience for after-hours drop-offs. This is along the east side of the building.
Weaverland Valley Authority
The WVA is an eight (8) person board. The board members are appointed by both the Township (4) and the Borough (4). Shown below is the current schedule of WVA roles and members.
The reocurring monthly meetings will be held at the East Earl Township office at 6:30 p.m.
The minutes from past WVA meetings are listed below.
---2024---
---2023---
---
To download a copy of the Joint Act 537 Plan Download click the link to the PDF below. (PDF file is 93MB)
Specifications for integration into the water/sewer systems can be downloaded below.